LaFleur Minerals files NI 43-101 report for Swanson Gold Deposit PEA, showing 65% IRR and C$101M NPV, targeting gold production restart in Québec's Abitibi BeltLaFleur Minerals files NI 43-101 report for Swanson Gold Deposit PEA, showing 65% IRR and C$101M NPV, targeting gold production restart in Québec's Abitibi Belt

LaFleur Minerals Files Technical Report Supporting Swanson Gold Project Economic Assessment

2026/03/28 03:05
2분 읽기
이 콘텐츠에 대한 의견이나 우려 사항이 있으시면 crypto.news@mexc.com으로 연락주시기 바랍니다

LaFleur Minerals Inc. announced the filing of an independent NI 43-101 technical report supporting its preliminary economic assessment for the Swanson Gold Deposit and Beacon Gold Mill in Québec’s Abitibi Gold Belt. The report outlines a vertically integrated mine-to-mill strategy and a potential restart of gold production at the project located near Val-d’Or.

The preliminary economic assessment highlights include a 65% after-tax internal rate of return, a net present value of C$101 million at a 5% discount rate, and all-in sustaining costs of US$1,569 per ounce. These financial metrics leverage existing infrastructure and target staged expansion of the project. The company is advancing engineering, drilling and permitting activities toward a potential production decision.

The Swanson Gold Project encompasses approximately 18,304 hectares and includes several prospects rich in gold and critical metals previously held by Monarch Mining, Abcourt Mines, and Globex Mining. LaFleur has consolidated a large land package along a major structural break that hosts the Swanson, Bartec and Jolin gold deposits and several other showings. The project is easily accessible by road, allowing direct access to several nearby gold mills, which enhances its development potential.

LaFleur’s fully permitted and refurbished Beacon Gold Mill is capable of processing over 750 tonnes per day and is being considered for processing mineralized material from Swanson and for custom milling operations for other nearby gold projects. The company’s mission is to advance mining projects with a focus on its resource-stage Swanson Gold Project and the Beacon Gold Mill, which have significant potential to deliver long-term value.

The latest news and updates relating to the company are available in its newsroom at http://ibn.fm/LFLRF. The technical report filing represents a significant step forward for LaFleur Minerals as it works to advance the Swanson Gold Project toward potential production in one of Canada’s most established mining regions.

Blockchain Registration, Verification & Enhancement provided by NewsRamp™

This news story relied on content distributed by InvestorBrandNetwork (IBN). Blockchain Registration, Verification & Enhancement provided by NewsRamp™. The source URL for this press release is LaFleur Minerals Files Technical Report Supporting Swanson Gold Project Economic Assessment.

The post LaFleur Minerals Files Technical Report Supporting Swanson Gold Project Economic Assessment appeared first on citybuzz.

시장 기회
Chainbase 로고
Chainbase 가격(C)
$0.08879
$0.08879$0.08879
-3.85%
USD
Chainbase (C) 실시간 가격 차트
면책 조항: 본 사이트에 재게시된 글들은 공개 플랫폼에서 가져온 것으로 정보 제공 목적으로만 제공됩니다. 이는 반드시 MEXC의 견해를 반영하는 것은 아닙니다. 모든 권리는 원저자에게 있습니다. 제3자의 권리를 침해하는 콘텐츠가 있다고 판단될 경우, crypto.news@mexc.com으로 연락하여 삭제 요청을 해주시기 바랍니다. MEXC는 콘텐츠의 정확성, 완전성 또는 시의적절성에 대해 어떠한 보증도 하지 않으며, 제공된 정보에 기반하여 취해진 어떠한 조치에 대해서도 책임을 지지 않습니다. 본 콘텐츠는 금융, 법률 또는 기타 전문적인 조언을 구성하지 않으며, MEXC의 추천이나 보증으로 간주되어서는 안 됩니다.